



BIM · Architecture · MEP · Construction
Every beam, duct and wall, solved before site.
C2C Innovation is a BIM-led design and construction company. We model, coordinate and build hospitals, housing, campuses and offices across India, for clients like HSCC, CPWD and ESIC.
Trusted on projects for


01 About us
We simplify complex projects, from concept to construction.
Our architects, BIM specialists, engineers and site teams create detailed 3D models, so you see your project before it is built. That means fewer errors, better teamwork and saved time and money, on small projects and large developments alike.
Our vision
To be a trusted BIM partner delivering smarter, coordinated, future-ready digital solutions for the built environment.
Our mission
High-quality BIM services that improve collaboration, reduce risk, control cost and sharpen decisions from design to handover.
02 BIM capabilities
From first model to as-built.
We model at every level of development, so the model grows with your project.
- LOD 200Schematic design. Fast, flexible models with approximate sizes and locations, so everyone sees the spaces early and decides faster.
- LOD 300Detailed design. Precise geometry and exact locations, flowing straight into drawing production and cutting drafting hours.
- LOD 350Construction coordination. Connections, supports and interfaces between disciplines modelled, solving clashes before they reach the field.
- LOD 400Fabrication & assembly. Detail-rich, procurement-ready models that let contractors go straight to shop fabrication.
- LOD 500As-built & facility management. Field-verified as-built data in the final model, a ready database for facility managers from day one.


Drawing production
Schematic, detailed, tender, for-construction and as-built drawings, taken straight from the coordinated model.

Clash detection
Federated models, clash matrix and Navisworks clash reports, so problems are fixed on screen, not on site.

Quantity take-off
Accurate material, labour and cost quantities from the 3D model, to keep the project on budget.

4D simulation
Time linked to the model: installation sequences mapped and scheduling conflicts found before breaking ground.
Software
Autodesk RevitNavisworksAutoCADAutodesk Construction CloudBIM 360ReCapSketchUpEnscapeTwinmotionStandard: ISO 1965003 What we do
Everything your building needs, under one roof.
Seven services that work together, so nothing is lost between the designer, the engineer and the site.

BIM Solutions
3D BIM models from LOD 200 to LOD 500, coordinated across architecture, structure and MEP.

Architecture
Hospitals, housing, campuses, offices and homes, planned from first sketch to site-ready drawings.

Interior Design
Offices, restaurants, stores, gyms and homes that blend form and function.

Structure
Structural design and BIM models for safe, efficient, cost-effective buildings.

MEP Engineering
HVAC, electrical, plumbing and fire fighting, designed and coordinated in BIM.

Construction
Design-and-build (EPC) and turnkey execution with skilled craftsmanship start to finish.

Graphic Design
Presentations, concept boards and marketing material that show your vision clearly.
04 Major projects
Buildings that matter.





Interiors & fit-outs
Spaces people love to use.
05 Sectors
Who we build for.
Hospitals, campuses, housing, offices, hospitality and infrastructure.

Healthcare
Hospitals and critical care blocks

Institutional
Campuses, hostels and faculty housing

Housing
Government and private residential quarters

Commercial & offices
Offices, stores and government buildings

Hospitality
Restaurants, bars, gyms and clubs

Infrastructure
Station buildings and public infrastructure
06 Why choose us
Built to be built.
- Strong coordination between design and construction teams
- Clear scope control and defined BIM deliverables
- A practical, build-focused modelling approach
- Proven experience in sales gallery and immersive BIM solutions
- Reliable timelines and quality-driven execution
Concept
We understand your brief, site and budget, then share the first ideas and massing models.
Design
Architecture, structure and MEP designed together in one coordinated BIM model.
Detail
Clash-free drawings, schedules and quantities, so the site has every answer.
Deliver
We build it, check quality at every stage and hand over with as-built models.

Let's talk
Planning a hospital, campus, housing or office project?
Share your drawings or idea. We'll come back with a clear scope, timeline and quote. The first consultation is free.



